The Southern River Precinct 3D Structure Plan covers Lots 8, 9 and 1792 Holmes Street and Lots 5 and 6 Matison Street, Southern River.


What is the main aim of the project?

The purpose of the Structure Plan is to guide future subdivision and development in that area. The Structure Plan has been prepared in accordance with the Southern River Precinct 3 Local Structure Plan. Further information on the Structure Plan is available below.


More information

Information Related to Original Structure Plan